California - Fusion Project
Posted September 9, 2021
Thank you goes to Darin Predmore and the Core & Main group for sending us this great pic of a tie-in point being installed on the Buena Outfall Sewer Force Main (City of Vista, California).
The tie-in point was connected with two Strongbridge Tega 24" electrofusion couplers that were fused with our 240V electrofusion processor.